by Alexander Samoylovich
Apr 14
December 10, 2025
Installed the elevator piano hinges safety wires.Measured and drilled the header tank post.Removed and measured the flapperon pull rods. The Zenith supplied threads are 10 mm too long.
Cancel
Zenith 750 Cruzer, Elevator safety wires
by Alexander Samoylovich
Apr 14
December 10, 2025
Installed the elevator piano hinges safety wires.
Measured and drilled the header tank post.
Removed and measured the flapperon pull rods. The Zenith supplied threads are 10 mm too long.