Hello, I need some "real" life experience.
My son (43 engineer) and I (70 com, CFI), both pilot, and life-long EAA members just purchased a 601 XL with the original Jabiru. 4 hours on the engine, and 0 on the frame. It sat covered from 2008 on. Included in this purchase is the "Flutter" factory kit. For a diligent worker with fair experience and A&P support readily available, What's the real insulation time.
Thanks A Bunch, RG Tracy
Tags:
I'd be concerned over whether the engine was pickled or not. Should probably talk to these guys since they're the US Jabiru engine distributors:
I didn't track my hours and the center spar was already done. I was told 100 hours but I think it was maybe half that. You are going to remove ~1000 rivets. Get some automatic center punches and turn the tip into a straight sided punch to punch out the rivet stem. Makes drilling out the rivets much easier.
You should be able to find a pin punch in the necessary size at your local hardware/home improvement store.
It was around 100 hours for me working alone.
Dave G.
Zenith Planes & Parts For Sale
Classified listings for buying or selling Zenith builds and parts...
Custom Instrument Panels
for your Zenith:
Custom instrument panels are now available directly from Zenith Aircraft Company exclusively for Zenith builders and owners. Pre-cut panel, Dynon and Garmin avionics, and more.
Zenith Homecoming Tee:
Flying On Your Own Wings:
A Complete Guide to Understanding Light Airplane Design, by Chris Heintz
Transition training:
Aircraft Spruce & Specialty for all your building and pilot supplies!
How to videos from HomebuiltHELP.com
Developed specifically for Zenith builders (by a builder) these videos on DVD are a great help in building your own kit plane by providing practical hands-on construction information. Visit HomebuiltHelp.com for the latest DVD titles.
© 2026 Created by Zenith.Aero.
Powered by
Exlusive online community for active builders and pilots of Zenith Aircraft kits (Chris Heintz / Zenair light airplane designs).