Patrick L. Hatfield's Blog – June 2013 Archive (1)

CH-701 Elevator Confusion

Plans indicate the trailing edge beveled edge on the top of the elevator pointing 15 degrees up, causing a permanent down trim.

The instructions indicate in two separate places, the beveled trailing edge should be on the bottom of the elevator creating a flat and  neutral lift trailing edge.

My question is:  which is the correct?

Added by Patrick L. Hatfield on June 18, 2013 at 9:54pm — 4 Comments

New from Zenith:

Zenith Planes For Sale 
 

Classified listing for buying or selling your Zenith building or flying related stuff...


Custom Instrument Panels
for your Zenith
:

Custom instrument panels are now available directly from Zenith Aircraft Company exclusively for Zenith builders and owners. Pre-cut panel, Dynon and Garmin avionics, and more.


Zenith Homecoming Tee:


Zenair Floats


Flying On Your Own Wings:
A Complete Guide to Understanding Light Airplane Design, by Chris Heintz


Builder & Pilot Supplies:

Aircraft Insurance:

 
 

West Coast USA:

 
Pro Builder Assistance:

 

Transition training:

Lavion Aero

K&S Aviation Services

Aircraft Spruce & Specialty for all your building and pilot supplies!

How to videos from HomebuiltHELP.com

Developed specifically for Zenith builders (by a builder) these videos on DVD are a great help in building your own kit plane by providing practical hands-on construction information. Visit HomebuiltHelp.com for the latest DVD titles.

© 2024   Created by Zenith.Aero.   Powered by

Badges  |  Report an Issue  |  Terms of Service