Dale Medendorp's Blog – December 2009 Archive (1)

Inspect removed rivets

The procedure I use to remove the AD-6 rivets from the spar for the upgrade is to first drill through the head with a 5/32 drill, shear the head off with a chisel, and then drill about 1/4" into the rivet with a 1/8" drill. I then use a 1/8" punch with an air hammer and push the rivet out.



The last thing I do is inspect the rivet to make sure that the drilling operation didn't go beyond the circumference of the rivet resulting in an enlarged hole in the spar. I'm happy to report that… Continue

Added by Dale Medendorp on December 4, 2009 at 1:59pm — 5 Comments

Monthly Archives

2011

2009

New from Zenith:

Zenith Planes For Sale 
 

Classified listing for buying or selling your Zenith building or flying related stuff...


Custom Instrument Panels
for your Zenith
:

Custom instrument panels are now available directly from Zenith Aircraft Company exclusively for Zenith builders and owners. Pre-cut panel, Dynon and Garmin avionics, and more.


Zenith Homecoming Tee:


Zenair Floats


Flying On Your Own Wings:
A Complete Guide to Understanding Light Airplane Design, by Chris Heintz


Builder & Pilot Supplies:

Aircraft Insurance:

 
 

West Coast USA:

 
Pro Builder Assistance:

 

Transition training:

Lavion Aero

K&S Aviation Services

Aircraft Spruce & Specialty for all your building and pilot supplies!

How to videos from HomebuiltHELP.com

Developed specifically for Zenith builders (by a builder) these videos on DVD are a great help in building your own kit plane by providing practical hands-on construction information. Visit HomebuiltHelp.com for the latest DVD titles.

© 2024   Created by Zenith.Aero.   Powered by

Badges  |  Report an Issue  |  Terms of Service