Online Community of Zenith Builders and Flyers
Just finished making the 4 slats and had the unpleasant task of rejecting 1 outboard slat due to dissimilar profile to the other 3. De- riveted and made up 3 new ribs to reassemble. The cause of the problem was the nose of the ribs were not fitted 100% correct so when all is done and riveted the resulting curve profile is different to the mating slat, ie you cant get the 2 slats, inboard and outboard to slide together. So tip to fellow scratch builders doing slats is make absolutely sure the…
ContinueAdded by Raymond Paul on March 19, 2013 at 4:52am — No Comments
Building the flaperons has been a challange for sure, scratch building, just another tip here which I learnt the hard way. DONT predrill the 3/32 soft rivet holes in the trailing edge, rather complete all riveting, then keeping the flap trailing edge flat, hold a lenght of timber along the trailing edge to press the upper and lower surfaces down straight and then drill and cleco, you will find then the flap comes out 100% straight.Hope to complete the 4th and last flap tonite!
Added by Raymond Paul on February 12, 2013 at 9:22am — 2 Comments
Thouhgt I would pass this on for scratch builders mostly. I had a problem pulling down the top section of the flaperon skin after securing the bottom side of the skin. I left off the hinge brackets till after I had lined up and drill rivet holes. What was happening is the 2 little nose ribs were being distorted and bent as I pulled up the skin with the straps. Quick fix was to insert the wooden form blok back into the nose ribs, pull the skin up tite, mark and drill rivets holes. Now when…
ContinueAdded by Raymond Paul on January 31, 2013 at 9:49am — 2 Comments
Please can somebody help me before I have to open an inventory for plane #3. I am struggling to bend the doublers on the horizontal stabilzer.When the doubler comes out the bending break it looks like a dam banana, whats the trick to bending a doubler and getting it to stay straight. I even tried bending it on the edge of a full sheet and cutting it off after bending, this was a disaster, came out like a twisted banana!!. Thankfully I will be needing plenty L's in the build so hoping to…
ContinueAdded by Raymond Paul on June 28, 2012 at 8:25am — 20 Comments
Merry Xmas All, well still waiting for customs to release my parcel containing the plans. Took 6 days to get here by Fedex and so far 14 days and counting to get it cleared . Seems our super efficent customs service here in zimbabwe has succumbed to xmas fever!!!!!!!!
Added by Raymond Paul on December 26, 2011 at 7:29am — 2 Comments
Classified listing for buying or selling your Zenith building or flying related stuff...
Custom Instrument Panels
for your Zenith:
Custom instrument panels are now available directly from Zenith Aircraft Company exclusively for Zenith builders and owners. Pre-cut panel, Dynon and Garmin avionics, and more.
Zenith Homecoming Tee:
Flying On Your Own Wings:
A Complete Guide to Understanding Light Airplane Design, by Chris Heintz
Pro Builder Assistance:
Transition training:
Aircraft Spruce & Specialty for all your building and pilot supplies!
How to videos from HomebuiltHELP.com
Developed specifically for Zenith builders (by a builder) these videos on DVD are a great help in building your own kit plane by providing practical hands-on construction information. Visit HomebuiltHelp.com for the latest DVD titles.
© 2024 Created by Zenith.Aero. Powered by
Exlusive online community for active builders and pilots of Zenith Aircraft kits (Chris Heintz / Zenair light airplane designs).